Solar panels in Tauranga and the Bay of Plenty

The Bay of Plenty is one of New Zealand's better solar regions, at 1,450 to 1,550 kWh a year per kW installed (Solar Scout). A 6.6kW system typically costs $14,000 to $15,000 installed and makes about 9,600 to 10,200 kWh a year. Tauranga is on Powerco's network, which charges no application fee for systems of 10kW or less.

Last checked

Status in Bay of PlentyWaitlistWe're contracting our installer here. Join the waitlist through the estimate and we'll email you when bookings open. No deposit is taken until then.

What do I need to know about solar in Bay of Plenty?

Most of Bay of Plenty is on Powerco, whose solar application fee is free for systems 10kW or less. Two other networks cover parts of the region, and the survey confirms which one you are on. Panels here generate about 1,450 to 1,550 kWh a year for every kW installed (Solar Scout).

  • Powerco covers Tauranga and the western Bay of Plenty, with a free application for systems of 10kW or less and a 10kW export limit (MySolarQuotes).
  • The eastern Bay of Plenty is on Horizon Networks, and Rotorua is on Unison. The survey confirms your network and its rules.
  • Solar Scout puts the region's output at 1,450 to 1,550 kWh per kW a year, second only to Nelson and Marlborough in its table.
Main lines company
Powerco
Other networks
Horizon Networks (eastern Bay of Plenty), Unison (Rotorua and Taupō)
Application fee
Free for systems 10kW or less (Powerco)
Output per kW a year
1,450 – 1,550 kWh

What do solar packages cost in Bay of Plenty?

Typical NZ installed prices are $11,000 to $18,000 across the three standard sizes (Solar Scout, 2026), and the table below pairs each with what it generates in a year in Bay of Plenty. Fixed prices are published once Bay of Plenty's installer is contracted; until then the table shows the sourced market range.

Price and yearly output
PackageTypical NZ priceOutput a year
5kW package$11,000 – $13,0007,250 – 7,750 kWh
6.6kW package$14,000 – $15,0009,570 – 10,230 kWh
10kW package$15,000 – $18,00014,500 – 15,500 kWh

See what solar costs in NZ and how it works.

How sunny is Bay of Plenty for solar?

Tauranga averages 2,402 sunshine hours and 1,535 kWh of solar energy per square metre a year (NIWA, 1991–2020). That is about 3% more solar energy than Auckland (1,490 kWh/m²). One 440W panel lying flat would catch about 676 kWh a year here, before system losses; tilting it north wins some of that back.

Sunshine hours and solar energy are not the same thing: cloud cuts the hours more than the energy, which is why Queenstown has about 600 fewer sunshine hours than Nelson but almost the same energy. Energy per m² is the number that predicts output. More on that in solar panel efficiency in NZ.

Sunlight a year in ten NZ towns (NIWA 1991–2020 averages via Harrisons Solar) and what one 440W panel lying flat would catch (our arithmetic)
TownSunshine hourskWh/m²One 440W panel, kWh
Blenheim2,5211,539677
Tauranga (this region)2,4021,535676
Auckland2,1221,490656
Nelson2,4971,468646
Hamilton2,0341,468646
Queenstown1,8991,463644
Wellington2,0941,384609
Christchurch2,1281,370603
Invercargill1,7651,231542
Dunedin1,7761,199528

Common questions in Bay of Plenty

Consent rules are national: since 23 October 2025, most roof arrays under 40 m² need no building consent. See the consent guide.

How much do solar panels cost in Tauranga?

About $11,000 to $13,000 for 5kW, $14,000 to $15,000 for 6.6kW and $15,000 to $18,000 for 10kW installed (Solar Scout).

Does Powerco charge to connect solar?

No. Powerco's application for systems of 10kW or less is free, with a 10kW export limit (MySolarQuotes).

How much does solar generate in the Bay of Plenty?

1,450 to 1,550 kWh per kW per year, so about 9,600 to 10,200 kWh from a 6.6kW system (Solar Scout).